Academic Archives | McShane Construction /building-type/institutional/academic/ Serving Clients Nationwide Tue, 02 Nov 2021 14:30:17 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 Cristo Rey St. Martin College Prep /portfolio/cristo-rey-st-martin-college-prep/ Wed, 09 Jun 2021 15:06:51 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7204 McShane Construction Company provided the comprehensive renovation services for Cristo Rey St. Martin College Prep, a charter high school located on a 14-acre infill site formerly housing a Kmart in Waukegan, Illinois. The exterior of the single-story 115,300-square-foot facility was modified to a more contemporary look that included CMU block… ...

The post Cristo Rey St. Martin College Prep appeared first on McShane Construction.

]]>
Play Video

McShane Construction Company provided the comprehensive renovation services for Cristo Rey St. Martin College Prep, a charter high school located on a 14-acre infill site formerly housing a Kmart in Waukegan, Illinois.

The exterior of the single-story 115,300-square-foot facility was modified to a more contemporary look that included CMU block masonry, exterior wall reinforcement, aluminum windows, a new aluminum curtainwall and partial roof replacement featuring 29 skylights to enhance natural light.

As part of Phase I, McShane renovated 55,000 square feet of interior space encompassing numerous classrooms, laboratories, offices, a cafeteria and library. All mechanical, electrical, plumbing and fire protection systems were completely replaced and the facility boasts a web-based building automation system upon completion to maximize building efficiency.

Phase II of construction included the renovation of 42,000 square feet, which included the addition of four new classrooms, a chapel, office and meeting space, a fitness center, locker rooms and a gymnasium with a performing arts stage.

The post Cristo Rey St. Martin College Prep appeared first on McShane Construction.

]]>
BMW Walker Training Facility /portfolio/bmw-walker-training-facility/ Mon, 01 Jan 2018 15:00:54 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7123 McShane Construction Company provided the comprehensive design/build construction services for the BMW Walker Training Facility, a 52,567-square-foot automotive training facility located in College Park, Georgia on behalf of Pure Development. The contemporary facility features tiltwall construction and encompasses 13 classrooms, 13 workshops, locker rooms, special tools storage, two professional training… ...

The post BMW Walker Training Facility appeared first on McShane Construction.

]]>
McShane Construction Company provided the comprehensive design/build construction services for the BMW Walker Training Facility, a 52,567-square-foot automotive training facility located in College Park, Georgia on behalf of Pure Development.

The contemporary facility features tiltwall construction and encompasses 13 classrooms, 13 workshops, locker rooms, special tools storage, two professional training classrooms, break room and administrative area.

Walker Training Facility is bisected along the length of the building by a Main Street corridor, which will feature a higher roof clearance with clerestory windows and accommodate vehicles coming in and out of the workshop areas from a secure parking area.

The post BMW Walker Training Facility appeared first on McShane Construction.

]]>
Instituto Health Sciences Career Academy /portfolio/instituto-health-sciences-career-academy/ Sat, 01 Nov 2014 15:02:19 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7215 McShane Construction Company provided the adaptive reuse construction services for Instituto Health Sciences Career Academy charter high school located in Chicago’s Pilsen neighborhood. The three-story, 100,890-square-foot secondary school was constructed to meet LEED-Silver standards and incorporates features such as natural day lighting and ventilation, low 3 materials, energy efficient heating… ...

The post Instituto Health Sciences Career Academy appeared first on McShane Construction.

]]>
McShane Construction Company provided the adaptive reuse construction services for Instituto Health Sciences Career Academy charter high school located in Chicago’s Pilsen neighborhood.

The three-story, 100,890-square-foot secondary school was constructed to meet LEED-Silver standards and incorporates features such as natural day lighting and ventilation, low 3 materials, energy efficient heating and cooling systems, low-e glass and low-flow plumbing finishes.

The assignment included the extensive demolition of a free-standing building to the north of the property, as well as the partial demolition and reconstruction of the existing 77,280-square-foot former industrial facility and 23,610 square feet of new construction.

The interior offers nine science labs, individual classrooms, group learning environments, a library, a cafeteria, office space and common areas.

The post Instituto Health Sciences Career Academy appeared first on McShane Construction.

]]>
Valparaiso FITT Project /portfolio/valparaiso-fitt-project/ Mon, 01 Sep 2014 14:49:36 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7189 McShane Construction was selected by Valparaiso University to provide comprehensive construction services for its FITT (Football, Intramurals, Track and Tennis) Project. The project entails renovations to the existing football field including future provisions for the addition of an eight-lane track, construction of multiple tennis courts and recreational areas and the… ...

The post Valparaiso FITT Project appeared first on McShane Construction.

]]>
McShane Construction was selected by Valparaiso University to provide comprehensive construction services for its FITT (Football, Intramurals, Track and Tennis) Project.

The project entails renovations to the existing football field including future provisions for the addition of an eight-lane track, construction of multiple tennis courts and recreational areas and the construction of a storage facility for the Athletic Department.

Brown Field, located behind the ARC, is home to the Crusaders football team and is near the new courts for the men’s and women’s tennis teams. This project represents a comprehensive renovation and construction program across multiple areas of the campus.

Architectural services and space planning was provided by Solomon Cordwell Buenz & Associates Inc. and SportsPLAN Studio.

The post Valparaiso FITT Project appeared first on McShane Construction.

]]>
The University of Chicago /portfolio/the-university-of-chicago/ Sun, 01 Sep 2013 14:45:17 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7174 McShane Construction Company was selected by The University of Chicago to provide the comprehensive design/build services for an 86,616-square-foot Facilities Services Building located at 5225 South Cottage Grove Avenue in Chicago, Illinois. This assignment was the first design/build project undertaken by the university. The two-story, LEED-Gold certified facility is situated… ...

The post The University of Chicago appeared first on McShane Construction.

]]>
McShane Construction Company was selected by The University of Chicago to provide the comprehensive design/build services for an 86,616-square-foot Facilities Services Building located at 5225 South Cottage Grove Avenue in Chicago, Illinois. This assignment was the first design/build project undertaken by the university.

The two-story, LEED-Gold certified facility is situated on a 1.85-acre site and provides maintenance services and storage for the university.

The building features a tinted precast exterior with a light sandblasted contemporary finish. The interior of the facility offers a 24′ clear height, one external dock, one drive-in door and an ESFR sprinkler system.

Sitework provided by McShane incorporated landscaping, sidewalks, employee and visitor parking and 68 parking spaces for the university’s fleet vehicles.

The post The University of Chicago appeared first on McShane Construction.

]]>
Notre Dame Athletics Center /portfolio/notre-dame-athletics-center/ Thu, 01 Aug 2013 14:26:53 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7156 McShane Construction Company was selected to provide comprehensive design/build services for the Notre Dame Athletics Center in South Bend, Indiana. Construction of the facility was completed in five phases to coincide with the university’s athletic schedules. The project included the renovation of the existing Loftus Building and the construction of… ...

The post Notre Dame Athletics Center appeared first on McShane Construction.

]]>
McShane Construction Company was selected to provide comprehensive design/build services for the Notre Dame Athletics Center in South Bend, Indiana.

Construction of the facility was completed in five phases to coincide with the university’s athletic schedules. The project included the renovation of the existing Loftus Building and the construction of the 95,740-square-foot Don F. and Flora Guglielmino Family Athletics Center.

The center features offices for the football coaches and staff, team auditorium and meeting rooms, athletic trainer facilities, strength and conditioning stations, equipment rooms and locker rooms.

Architectural services and space planning for the project were provided by Solomon Cordwell Buenz & Associates Inc. and SportsPLAN Studio.

The post Notre Dame Athletics Center appeared first on McShane Construction.

]]>
Defense Acquisition University /portfolio/defense-acquisition-university/ Mon, 01 Jul 2013 14:14:58 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7133 McShane Construction Company provided the design/build services for the 62,500-square-foot build-to-suit Defense Acquisition University, located at 7115 Old Madison Pike in Huntsville, Alabama. Triad Properties executed a lease with the U.S. General Services Administration on behalf of tenant, Defense Acquisition University, a division of the Department of Defense that provides… ...

The post Defense Acquisition University appeared first on McShane Construction.

]]>
McShane Construction Company provided the design/build services for the 62,500-square-foot build-to-suit Defense Acquisition University, located at 7115 Old Madison Pike in Huntsville, Alabama.

Triad Properties executed a lease with the U.S. General Services Administration on behalf of tenant, Defense Acquisition University, a division of the Department of Defense that provides mandatory, assignment specific and continuing education courses for military and civilian personnel.

McShane constructed the facility with a brick and glass exterior and state-of-the-art interior finishes. The structure features a number of green building techniques and was designated LEED-Gold by the U.S. Green Building Council.

The post Defense Acquisition University appeared first on McShane Construction.

]]>
Valparaiso Arts & Sciences Building /portfolio/valparaiso-arts-sciences-building/ Sat, 01 Jun 2013 14:47:13 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7182 McShane Construction Company completed the design/build construction of a 51,500-square-foot classroom and office addition to the Christopher Center Library at Valparaiso University. The addition features a masonry, aluminum, precast and glass exterior that incorporates aluminum cladding, generous windowlines and additional aesthetic elements. The interior offers lobby space, offices, a teacher’s… ...

The post Valparaiso Arts & Sciences Building appeared first on McShane Construction.

]]>
McShane Construction Company completed the design/build construction of a 51,500-square-foot classroom and office addition to the Christopher Center Library at Valparaiso University.

The addition features a masonry, aluminum, precast and glass exterior that incorporates aluminum cladding, generous windowlines and additional aesthetic elements.

The interior offers lobby space, offices, a teacher’s lounge and flexible office and classroom areas for the Arts and Sciences Department. Interior finishes include acoustical tile, exposed concrete floors and exposed steel elements.

The LEED-Silver assignment incorporates numerous sustainable elements including an energy-efficient HVAC system, recycled and low-VOC materials and certified wood products, among others.

The post Valparaiso Arts & Sciences Building appeared first on McShane Construction.

]]>
OSHA Training Center /portfolio/osha-training-center/ Tue, 01 Jun 2010 14:42:04 +0000 http://mcshane-construction.com/?post_type=portfolio&p=7164 McShane Construction Company was selected as the design/builder of the 57,700-square-foot National Office of Training and Education for OSHA (Occupational Safety and Health Administration). The build-to-suit headquarters is located on a 2.5-acre site at 2020 S. Arlington Heights Road in Arlington Heights, Illinois. More than 3,000 students per year utilize… ...

The post OSHA Training Center appeared first on McShane Construction.

]]>
McShane Construction Company was selected as the design/builder of the 57,700-square-foot National Office of Training and Education for OSHA (Occupational Safety and Health Administration).

The build-to-suit headquarters is located on a 2.5-acre site at 2020 S. Arlington Heights Road in Arlington Heights, Illinois.

More than 3,000 students per year utilize the facility’s six classrooms and three instructional labs for workplace safety and health courses.

McShane constructed the three-story facility with architectural precast panels accentuated with tinted glass windows.

The Rego Group was selected by the U.S. General Services Administration, the federal government’s real estate manager, as the developer of the project.

The post OSHA Training Center appeared first on McShane Construction.

]]>